Uncategorized

PANSEKE-ADIGBE ROAD PROJECT IN STEADY PROGRESS


By Abiodun Ali

The ongoing reconstruction project on the Panseke-Adigbe Road in Abeokuta, the State Capital is making steady and significant progress.

As at the time of filing this report, engineers could be seen preparing the ground on one side of the dualized road in preparation for asphalt. The left side is open for motorists, because that had been asphalted.

The affected length spans from Panseke to the Nigeria Navy Secondary School, NNSS.

This wss as drainage works continue at the Alowonle axis of the road, with the expected continuation of dualization when both sides of the Panseke-Navy stretch must have been asphalted.

It is a gradual but steady progress that promises to ease the flow of traffic and open the road that links three LGAs of Abeokuta South, Obafemi/Owode and Ewekoro.

Categories: Uncategorized

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.